Port traffic and performanceTunis, Tunisia

La Goulette–RadèsPort traffic study

Ships, cargo, passengers and performance at Tunisia’s main maritime gateway, 2019–2026, from ship tracking, port authority statistics and satellite images.

Sentinel-2 satellite image of the port of Radès and the channel to the Lake of Tunis
Sentinel-2 true colour, 2025. Contains modified Copernicus Sentinel data.

The question

How well does Tunisia’s main gateway work, and how much room does it have to grow?

This study as a Tessera mosaic

At a glance

Key numbers

All values are Tessera calculations from open data, or official figures quoted as published.

348k TEU
containers at Radès in 2025 (OMMP)
+47%
Radès containers, 2022 to 2025
65%
of national containers pass through the two ports
44 h
average time in port per ship, 2025 (Tessera estimate)
~25%
more traffic before queues build sharply (range 15–35%)
~2029
when berth occupancy passes 95% at 4% growth a year

Findings

What the evidence says

  1. Gateway

    La Goulette–Radès carries about 29% of national tonnage and 65% of containers.

  2. Growth

    Containers up 47% since 2022; cruise passengers up five-fold over the same years.

  3. Performance

    Mid-table in the World Bank’s Container Port Performance Index; connectivity well below regional hubs.

  4. Headroom

    About 25% more traffic before queues build sharply, used up by about 2029 at 4% growth a year.

From the report

Maps, models and drawings

A selection from the 72-page report. Every chart names its source.

Open data used

  • IMF PortWatch, 2019–2026
  • OMMP annual reports, 2022–2025
  • UNCTADstat
  • World Bank CPPI 2023
  • Copernicus Sentinel-1 and Sentinel-2
  • Open-Meteo waves and ERA5 wind

Limits

A self-initiated study, not commissioned by the port authority or any operator. Time-in-port and capacity figures are estimates and are not a basis for investment decisions.